EPIC SALE
Skip to product information

Troy Lee Designs

Troy Lee Designs Flowline SE MTB Helmet with MIPS - Radian - Charcoal-Red

Troy Lee Designs Flowline SE MTB Helmet with MIPS - Radian - Charcoal-Red

Regular price $99.99
Sale price $99.99 Was $159.99 Save $60.00
Troy Lee Designs Logo

EXTRA 10% OFF

Use Code SALE10
SHOP ALL SALE
Color
Size

Product ID: BW012423-11

Earn rewards points on this item / Join Now

Only 1 Items Left

 

Shop all Troy Lee Designs   |   Shop all MTB Helmets

View full details

Description

The all-new Flowline SE Helmet is handpicked, literally, by the pros and for good reason. The Flowline SE Helmet features all the same marquee accolades as the Flowline Helmet including an NTA 8776 E-Bike Certification and Virginia Tech 5-Star Safety rating but with upgrades. Premium details like a fidlock® magnetic buckle, Anti-Microbial Quick Dry comfort liner, dual density EPS and more make Flowline SE the premium choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


You Might Also Like

Ratings & Reviews

>