Item added to your cart
EPIC SALE





Troy Lee Designs
Troy Lee Designs Flowline SE MTB Helmet with MIPS - Radian - Charcoal-Red
Troy Lee Designs Flowline SE MTB Helmet with MIPS - Radian - Charcoal-Red
EXTRA 10% OFF
Use Code SALE10
SHOP ALL SALE
SHOP ALL SALE
Product ID: BW012423-11
Earn
rewards points on this item /
Join Now
Only 1 Items Left
Shop all Troy Lee Designs | Shop all MTB Helmets
View full detailsDescription
The all-new Flowline SE Helmet is handpicked, literally, by the pros and for good reason. The Flowline SE Helmet features all the same marquee accolades as the Flowline Helmet including an NTA 8776 E-Bike Certification and Virginia Tech 5-Star Safety rating but with upgrades. Premium details like a fidlock® magnetic buckle, Anti-Microbial Quick Dry comfort liner, dual density EPS and more make Flowline SE the premium choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
- 3-Way adjustable screwless visor
- NTA-8776 certified for E-Bike usage
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Fidlock® Magnetic Buckle System
- Dual Density EPS for low and high-speed impacts
- Anti-microbial Quick Dry Premium Liner
- Side strap adjusters
- 5-Star Virginia Tech safety rating
You Might Also Like




